Details: excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect. hard/dense soil earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of standard proctor's density with initial lift of 1.5m (excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect.with lead beyond 250 m and up to 750 m (½ km) (deduct in item no 16 (a) to (d) above if standard proctor's density to be achived is at least 90%) compaction of earth or highly weather
Sector: Water Resource Department