Details: a. ground floor earth work in excavation by mechanical means (hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed:all kinds of soil providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - all work up to plinth level. m10 grade nominal mix1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40mm nominal size). random rubble stone masonry for with hard stone in foundation and plinth in cement sand mortar above 30 cm thick wall in: cement mortar 1:6 ( 1-cement : 6-sand). filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter a
Sector: Forest and Environment