Details: mkxcsfyax djuk 5 ls 7-5 lseh- xgjkbz rd taxy dh lqkbz] lk/kkj.k oulifr rfkk >kfm;ksa dks dkavus lfgr benching base and disposal of the excavated material including dressing etc. complete within initial lead up to 50m and lift up to 1.5m excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect. for cut off tranch. hard / dense soil wrd bsr 2022 part "a" earthwork in excavation item no 1(b) excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect. for cut off tranch. hard soil mixed with kankar/ boulders , morrum wrd bsr 2022 part "a" earthwork in excavation item no 1(c) मिटटी का विभिन्न दूरी के लिए परिवहन सामग्री को चढ़ाना, उतारना व स्टेकिंग सहित | (
Sector: Irrigation