Details: excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect hard / dense soil cement concrete mix (1:3:6) m-10 well mixed and laid in position complete including all leads of all construction materials including curing and finishing having well graded crusher broken stone aggregate of maximum size upto 20 mm side shuttering including propping etc. complete (to achieve finish f 2 for :retaining wall up stream or down- stream facings of dams and open faces of construction joints etc. 9.11 nominal mix of plain cement concrete well mixed and laid in position using 20% max permissible limit of plums above 160 mm and up to 450mm, including curing and finishing etc including all leads of all construction materials complete in all respect with well graded crusher broken stone aggregate. the plums shall be distribu
Sector: Irrigation