Details: demolishing stone rubble masonry including stacking of useable material and disposal of unuseable material wihtin 50 m lead inclusive of de-watering wherever required in cement mortar dismantling cement concrete including disposal of material within 50 m lead, inclusive of de-watering wherever required. earth work in excavation including loading, unloading, disposal and dressing of excavated earth within intial lead of 50m and lift up to 1.5 m in dry or moist including dressing of excavated area dewatering wherever required complete in all respect (b)hard / dense soil . preparation and dressing the sub grade including removing irregulatites up to 7.5 cm in sol morrum mixed with pebbles, small boulders and highly weathered rock for bed. providing and laying in position of cement concrete nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excl
Sector: Irrigation