Details: cutting & clearance of jungle , bushes , shrubs ankra / ipomoea , julicflora typha etc. on canals and bunds in dry / moist / slushy conditins including disposal as per instructions of the engineer - in - charge. cost of wood has been deducted from rates and thus will be property of contractor after cutting.a. thick excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50 m and lift upto 1.5 m in dry or moist including dressing of excavated area, dewatering wherever required in all respect hard soil
Sector: Irrigation