Details: cutting and clearance of jungle, bushes, shrubs ankra / lpomoea, juliflora typna etc. on canal and bunds in dry / moist / slushy conditions including disposal as per instructions of the engineer-in-charge. cost of wood has been deducted from rates and thus will be property of contractor after cutting. thick supplying of well stitched earth filled bags of capacity, weigh not less than 40 kg per bag at site etc. complete. plastic bag. labour charges for making coffer dam/ring bund (under flowing / stagnate water pool) by loading transporting earth filed cement bags dropping at required locations in water including lead upto 3 km and lift upto 8 mtr. for nsl complete (excluding cost of earth filled cement bags). removal of slit/soil/earth, sand, pebbles, malba, debris, , stone pebbles and obstruction deposited in canal bed upto design line grade and sections having design due to erosion /scour/slips in canal banks / silting with or without bushes and weeds etc. in dry or moist condition
Sector: Irrigation