Details: art-a (civil work) based on bsr pwd 2019 earth work in excavation by mechanical means (hydraulic excavator ) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sum on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. all kinds of soils providing and laying in position cement concrete including curing compaction etc. complete in spcified grade excluding the cost of centering and shuttering all work upto plinth level m 10 grade nominal mix1:3:6(1 cement:3 coarse sand : 6 gradeed stone aggregate 20 mm nominal size). providing and laying cement concrete including curing, compaction etc. complete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or
Sector: School