Details: earth work in excavation by mechanical means (hydraulic excavator ) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. all kinds of soils providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - all work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). random rubble stone masonry for with hard stone in foundation and plinth in cement sand mortar above 30 cm thick wall in: : cement mortar 1:6 (1-cement:6-sand). supplying and fixing soorsagar bhura or equivalent ashlar sills, lintels and dassa, bearing, bed & top surface made perfenctly even, ja
Sector: School