Details: excavation for structures (earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)ordinary soil mechanical means depth upto 3 m pcc 1:3:6 in foundation (plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) plain/reinforced cement concrete in open foundation complete as per drawing and technical specifications.rcc grade m20 using concrete mixer dismantling of structures (dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including t&p and scaffolding wherever necessary, sorting the dismantled material, disposal of