Details: (01) a/r to juna beda road culvert earth work in excavation for foundation of structure complete with all lift, dewatering shoring and shuttering etc.including refilling of trenches in 25.mm layers, ramming, watering and disposal of surplus soil within a lead of 1000 metres, as per drawing and technical specfication. in ordinary/soft rock [morth specification: clause : 301]. if blasting is resorted to [morth spcification : clause : 302] providing and laying mechnically mixed and vibrated cement concrete in foundation upto a depth of 1.5 metres below ground level and 1.50 metres above ground/bed level.[morth specification : clause 1000/1700] cement concrete 1:3:6 mix crushed stone aggregates 20mm nominal size. providing and laying random rubble masonry in foundation upto a depth of 1.50 metres and 1.50 metres above ground /bed level.[morth specfication: clause 1000/1400] cement sand mortar 1:4 pointing with cement mortar (1:3) on stone masonry as per drawing and technical specificatio
Sector: PWD