Details: earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of engineer for follwing depths, below natural ground / road top level.in all types soils/ saturated soil such as moorum, sand, sandy silt,clay, black cotton soil, kankar, etc. depth upto 1.5 m providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - all work upto plinth level :1:4:8 (1 cement : 4 fine/ coarse sand : 8 graded stone aggregate 40mm nominal size). brick work with fps bricks of class designation 75 in foundation and plinth in:cement mortar 1:6 (1 cement : 6 coarse sand) providing and laying damp-proof course with cement concrete grade m-15 (1 : 2 : 4) mortar prepared with 1% solution of water-proof compound complete as per specificat
Sector: RDPR