Details: construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost ofcompensation for earth taken from private land complete as per mort&h specification clause 305. (lead taken upto 5 km) brick work with fps bricks of class designation 75 in foundation and plinth in :cement mortar 1:6 (1 cement : 6 coarse sand) cement plastering including t&p, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix :1:6 (1 cement : 6 fine/ coarse sand) cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded 20mm nominal size stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete.40mm thick providing and laying lean cement concrete 1:4:8 in sub- ba
Sector: RDPR