Details: excavation for structures (earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) ordinary soil. upto 3 m depth. pcc 1:3:6 in foundation (plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) plain/reinforced cement concrete in open foundation complete as per drawing and technical specifications pcc grade m15 plain/reinforced cement concrete in sub-structure complete as per drawing and technical specifications pcc grade m15 height upto 5m back filling behind abutment, wing wall and return wall complete as per drawing and technical specification granular materia supplying, fitting and placing un-coated hysd bar reinfo
Sector: PWD