Details: boq earth work in excavation including stacking/ disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth (morth specification clause 301 to 305).in ordinary soilmechanically by power shovel including mechanical loading and carriage upto 1 km by tipper/dumper random rubble dry stone kharanja under floor. providing and laying mechanically mixed and vibrated cement concrete in foundation upto a depth of 1.5 metres below ground level and 1.50 metres above ground/bed level as per morth specification : clause 1000 & 1700p.c.c. 1:4:8 mix with stone aggregate 40 mm hand broken aggregate. construction of un-reinforced without dowel bar plain cement concrete pavement over a prepared sub-base with 43 grade cement, coarse and fine aggregate conforming to is: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread,
Sector: Dairy