Details: earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sum on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. all kinds of soils providing and laying in position cement concrete including curing , compaction etc. complete in specified grade excluding the cost of centering and shuttering all work up to plinth level 1:4:8 ( 1 cement : 4 coarse sand : 8 graded stone aggregates 40 mm nominal size) brick masonry in foundation and plinth in cement mortar 1:6 using class designation 75 bricks etc. complete centering and shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns
Sector: Urban Authority