Details: providing, laying, spreading and compacting stone aggregate for wet mix macadam (as per table 400-12 and 400-13) specification including premixing the material with water to omc in wet mix plant as per approved design mix, carriage of mixed material by tipper to site, laying in uniform layers with motor grader/front end loader/paver finisher, in sub base/ base course on a well prepared under base and compacting with vibratory roller to achieve the desired density including lighting, guarding, barricading and maintenance of diversion etc. (morth specification : clause 406 & clause 112) by mechanical means with all lead . providing and applying primer coat over prepared surface or granular base with bitumen emulsion ss-1 as per is: 8887 & manufacturer’s specifications @ 6 kg /10 sqm with a self propelled or towed bitumen pressure sprayer equipped for spraying the material uniformly at specified rates and temperatures as per morth specification ci 502 & 112 (including cleaning of road
Sector: Urban Authority