Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material upto a lead of 1000m including removal and disposal of top organic soil not exceeding in 150 mm thickness as per morth specification clause 201, by manual means ., in area of light jungle removal of unserviceable soil, blown sand including excavation, loading and disposal upto 1000 m. lead. carriage of earth, sand, lime, morrum, manure or sludge etc. including loading and unloading complete with a lead of for 1 km.
Sector: Industry Development