Details: site clearance including uprooting of rank vegetation, bushes, woods, trees and sapplings of girth upto 150mm and removal of etc. complete) cutting of trees including cutting of trunks, branches and removal of stumps including stacking of serviceable material within a lead of 1000 meters with all lift and earth filling to required compaction in the depression/pit as per morth specification : clause 201 girth above 1800mm & upto 2700 mm earth work in excavation by mechanical means (hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : all kinds of soil add extra rate for quantities of works, executed : in or under foul position , including pumping out water as required @ 25% of above item rate providing and laying in position cement concrete including curing, compaction etc. complete in spec
Sector: Urban Authority