Details: earth work in excavation including stacking/ disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth (morth specification clause 301 to 305) in ordinary soil, mechanically by power shovel including mechanical loading and carriage upto 1 m tipper/dumper earth work in excavation in foundation trenches etc.in drains and channels etc. not exceeding 2m.depth, including dress-sing of bottom and sides of trenches, stacking the excavated soil 3m clear from the edge of excavation including disposal of surplus soil as directed within a lead of 1000 metres [morth specification : clause 301,304] ordinary soil construction of embankment with material obtained from borrow pits. construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transportation to site, spreading, grading to required slop and complacting to meet requirement of tables 300.1 and
Sector: Urban Authority