Details: earthwork in excavation for roadway in soil, including stacking / disposal of surplus material exclusive of compensation of earth (morth specification : clause 301 to 305). by mannual means providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per tables 400-12 & 400-13 and morth specification clause 406. by mechanical means with all lift and lead. providing and laying un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub-base with 43 grade cement, coarse and fine aggregate conforming to is:383, maximum size of coarse aggr
Sector: Urban Authority