Details: removal of unsuitable soil with disposal upto 1000 m removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per clause 305.3.4 as per morth specification clause 301.3.11 carriage of earth sand lime morrum manure or sludge etc. including loading-unloading with all lead & lift complete as per direction of engineer-in-charge granular sub-base with close graded material (table:- 400-1) plant mix method providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per table 400-1,400-2 or any other course material as per design mix, as per cbr in sub base course including premixing the material at omc in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader f.e loader on a prepared base and compacting with vibratory roller to achieve desired density (as per i.s.2720) inclu
Sector: Industry Development