Details: removal of slit/soil/earth, sand, pebbles, 'malba', debris, , stone pebbles de obstruction deposited in canal bed up to design line grade and sections having design due to erosion/scour/slips in canal banks/silting with or without bushes and weeds etc. in dry or moist condition from canal bed including dewatering, loading unloading and disposal at suitable place as directed by engineer in charge with initial lead of 50m. and lift upto 1.5 m with proper dressing on canal bed complete in all respect (ignp bsr-2023,ch-v, item no.-7(c),page no.-12) for depth above 30 cm
Sector: Irrigation