Details: earth work in excavation including stacking/ disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth (morth specification clause 301 to 305). in ordinary soil manually including breaking of clods providing and laying granular sub-base material having p.i.not more than 6, including compacted thickness and consolidation by 8-10 tonne power roller at omc to achieve desired density to required camber and grade including cost of water and hire charges of machinery, including t&p and all lead of material from quarry (compacted thickness to be measured). grading as per morth specification : table 400-1, 400-2 with cbr value not less than 15 to achieve 100% proctor density providing, laying, spreading and compacting stone aggregate of specific size as per table 400-6 & 400-7 to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with power roller 8-10 tonnes, in stages to proper grade and camber, a
Sector: PWD