Details: earth work in excavation by mechanical means (hydraulic excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sum on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 5000 meter. all kinds of soils providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - all work upto plinthlevel :1:4:8 (1 cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for :walls (any thickness) including attached pilasters, buttresses plinth and string course. providing and laying in position specified g
Sector: Urban Authority