Details: clearing and grubbing road land including uprooting rank vegetation, grass, bush, shrubs, saplings and trees of girth upto 300mm, removal of stumps, disposal of unserviceable material and stacking of serviceable material upto 1000 m from road boundry as per morth specification : 201 by mechanical means in area of light jungle construction of bt road from seel gaon to palri vyasa km 0/0 to 5/0 construction of bt road from kharnal via palri vyasa to kharnal-parasara road 0/0 to 4/0 earth work in excavation including stacking/ disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth (morth specification clause 301 to 305).in ordinary soilmechanically by power shovel including mechanical loading and carriage upto 1 km by tipper/dumpe construction of bt road from seel gaon to palri vyasa km 0/0 to 5/0 construction of bt road from kharnal via palri vyasa to kharnal-parasara road 0/0 to 4/0 construction of embankment with material obtained fr
Sector: PWD