Details: dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of to the dumping ground within 50 meter lead.(b-14.55) dismantling stone slab/ terrazo chip flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 meters lead..(b-14.25) providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - all work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size). (b-54/3.1.6) plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish : 25mm thick (b-139/12.3.1) providing and fixing steel glazed window frame made out of 80x40 mm hollow sheet section of 16 gauge thickness, joint mitred welded and grinded including hold fast of steel lugs 13mm x 3mm and 15 cm long embedded in c c block
Sector: Distribution