Details: clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of upto a distance of 50 m outside the periphery of the area cleared. clearing grass and removal of the upto a distance of 50 m outside the periphery of the area cleared. barricading with sal ballies as per design including tying with vertical post by coconut strings including digging out holes in all types of soil complete in all respect with two horizontal members height 1.2 m upto 1.5m above ground level and vertical supports upto 2.5 centre and upto 3 days period including removal and cleaning the site complete in all respect & including dressing of sides and providing retro reflective tapes for traffic safety as per direction of engineer-in charge in all types of soil. making of holes in cement concrete/ bitumenous road by power driven hammer for barricating work as per direction of engineer in charge barri
Sector: PWD