Details: part "a" civil work : surface dressing of the ground including removing vegetation and inequalities not exceeding 15cm deep and disposal of lead up to 50 mtr. and lift up to 1.5 mtr.: all kinds of soil earth work in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms, lift up to 1.5 mtr. including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. all kinds of soil earth work in excavation by mechanical means (hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : all kinds of soil filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each depos
Sector: Medical and Health