Details: construction of embankment with material deposited from roadway cutting (construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2) compacting original ground compacting original ground supporting embankment excavation in soil with dozer with lead upto 100 metres (excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in accordance with requirements of lines, rades and cross sections. excavation in ordinary rock with dozer with lead upto 100 metres (excavation for roadway in ordinary rock by deploying a dozer, 80 hp including cutting and pushing the cut earth to site of embankment upto a distance of 100 metres ( average lead 50 metres ), trimming bottom and side slopes in accordance
Sector: Urban Authority