Details: dismantling of existing structures like culverts, bridges, retaining walls, cc road and other structure comprising of masonry, cement concrete, wood work, steel work, including t&p and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by engineer cement concrete grade m-15 and above and pcc blocks dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. for thickness of tiles 10 mm to 25 mm carriage of materials by mechanical transportincluding loading, unloading and stacking : earth for 5.0 km dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of to the dumping ground within 50 metres lead. cement plastering including t&p, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 12 mm c
Sector: RDPR