Details: dismantling of flexible pavements for sewer line and manholes and disposal of dismantled materials up to a lead of 50 metres as directed by engineer including allowances for any additional dismantling beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task.bituminous courses providing and applying tack coat on the prepared surface with bitumen emulsion as per is: 8887 and approved quality @ 0.2 kg/sqm with the help of spray set fitted on bitumen container (boiler) after cleaning the surface with brooms or soft brushes and finally dusting with old gunny bags and compressed air to receive bituminous treatment complete as per clause 502 of mort&h specification including all material, labour, machinery, lighting, guarding and maintenance of diversion.extra for additional bitumen emulsion used in above item for every 1 kg per 10 sqm providing and laying bituminous macadam in 50/75 mm compacted thickness on prepared s
Sector: RDPR