Details: carriage of materials carriage of materials (by mechanical means): carriage of materials by mechanical transport including loading, unloading and stacking:: remark : the rates will be applicable to net quantities after deduction of prescribed percentage for voids mentioned in the specification under subhead "carriage of materials" 1) earth e) 5 km f) beyond 5 km upto 10 km. per km. earth work earth work in excavation in soil unsuitable for road construction such as marshy soil including pumping out water, removal of the same and disposal with all lift and lead upto 1 km as per mort&h specification clause 301. road works (sub-base/ bases) providing, laying, spreading (with paver finisher only) and compacting wet mix macadam (wmm) base course comprising of graded stone aggregate and granular material conforming to mort&h specifications (table 400-ii) in layers of equal compacted thickness each consolidated, including pre-mixing the material with water at omc in mechanical mixer (pug mill
Sector: RDPR