Details: providing and laying bituminous macadam in 50/75 mm compactedthickness on prepared surface with specified graded crushed stoneaggregates as per table 500-4, grading-ii for base/ binding course,loading of aggregate with f.e. loader, heating and mixing of stoneaggregate and bitumen in computerised hot mix plant, transported to site by tippers to paver, laid over a previously prepared surface with paver finisher fitted with electronic sensing device to the required grade, level and alignment and rolling with power roller and vibratory compactor as per clauses 501.6 and 501.7 to achieve the desired compaction complete as per clause 504 of mort&h specification and including all material, labour, machinery, lighting, guarding and maintenance of diversion but excluding cost of primer/ tack coat. with bitumen vg-grade 30 @ 3.3% (percentage by weight of totalmix) providing and laying open graded premix carpet 20mm thick(compacted), on prepared surface in a single course as wearing course, compo
Sector: RDPR