Details: construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 with a lead as per technical specification clause 301.5. with lead for 10 k.m. earth work in excavation by mechanical means (hydraulic excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. all kinds of soils random rubble dry stone kharanja under floor . providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering – all work up to plinth level. 1:4:8 ( 1 cement : 4 coarse sand :
Sector: Urban Authority