Details: dismantling r. c. floor, roof, beams etc. including cutting rods and removing as directed within a lead of 75m including stacking of steel bars. (a) in ground floor including roof. removal of , earth, etc. from the working site and disposal oif the same beyond the compound, in conformity with the municipal/corporation rules for such disposal, loading into truck and cleaning the site in all respect as per direction of engineer in charge. cleaning the exposed reinforcement preferably upto full diameter by wire brush, applying two coats of polymer based rust removing compound left for 24 hours, removing the coating and then applying two (2) coats of polymer modified anti corrosive protective coating formulated to inhibit the corrosion of reinforcement as per manufacturer's specification[mode of measurement: the affected susrface area of reinforcement shall be considered for payment] hire and labour charges for shuttering with centering and
Sector: Infrastructure