Details: dismantling r.c. floor, roof, beams etc. including cutting rods and removing as directed within a lead of 75 m. including stacking of steel bars.(a) in ground floor including roof. dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing as directed within a lead of 75 m.a) in ground floor including roof. 1st floor dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing as directed within a lead of 75 m. in ground floor including roof.(a) upto 150 mm. thick taking out mirzapur or glazed porcelain tiles carefully by chiselling from walls or floor including stacking serviceable material as directed. labour for taking out door and window frame including shutter for repair or replacement of different parts of the frame & refixing the same including mending good all damaes complete. (concrete and brick work for mending damage will be paid separately) (b) upto ar
Sector: PWD