Details: operation including supervision & transshipment of 2,000 ltr./hour capacity truck mounted mobile treatment unit (r.o. process) along with pouch making machine for treated flood water / catchment water & production of treated safe drinking water after bottling in a pouch (capacity 500 ml) production as & when required including arranging operator & helper for machine unit and driver for truck unit as directed by e.i.c. [rate includes wages, bonus, sundries, site expenditure, profit etc. pouch making machine operator & helper should be provided with gum boot & apron period: 01/09/2024 to 31/08/2025= 12 months cost of fuel and lubricant for movement of vehicle outside the district of actual placement as and when required by the department duly recorded with intimation and log book (rate of consumption of diesel is 4 km/ltr. bill should be drawn as per actual measurement.) cost of diesel for generator set run for the machine unit as entered in the log book. (rate of consumption of diesel i
Sector: Water supply and Sewerage