Details: mobilisation charges of all tools & plants along withaccessories, material, labour, supervision etc. at site of work required in connection with boring and testing work, including setting up boring rigs and shifting to different bore-hole points etc. and also including withdrawal of same from the site after completion of work, complete as per direction of engineer-in-charge.b) detailed investigation note: payment will be made after successful completionof work. carriage of all disturbed & undisturbed samplesfrom site of work to the divisional office or elsewhere including loading and unloading as per direction of engineer-in-charge. detailed investigation. note: some samples are to be kept at sub-division office for additional testing by the engineer-in-charge. labour for boring by sinking and finally withdrawing 50mm to 100mm dia. (internal) pipe by a standard method to any depth below ground level / bed level in all types of soil like clay, silt, sand, stiff clay, mixed soils etc
Sector: Urban Authority