Details: day to day operation and maintenance of flush mixer (1no), clarifier (1no), aerator(1no), and gutter channel including preparation and dosing of alum solution to correct proportion after weighing alum, lifting alum of alum tanks and mixing alum solution as necessary, including operation and maintenance of valves, switchs, gears, electric control panels, agitators including any other machinery installed as necessary for production of treated water by engaging skilled and experienced operators, licenced electrician, helpers, majdoors, plumbers, mechanist, welder etc. as may be necessary as per specification and direction of eic for running the plant efficiently for the period of 16 hrs. or as and when required including routine test of water daily or as per instruction of eic. the cost includs necessary running maintenance work of minor charactor like bearing replacement, change of necessary couplings, bolts, rubber bush, maintenance of rail track, replacement of spikes, scrapping, cle
Sector: Urban Authority