Details: dressing and chilchalling road flanks including cutting and filling with earth up to 150 mm average thickness finished with outward cross-grade of 1 in 30. construction of granular sub-base by providing graded material, mixing by mix in place method with rotavator at omc, spreading in uniform layers with motor grader on prepared surface in proper grade and camber, compacting with vibratory roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants including cost of quality control complete as per clause 401 of specifications for road & bridge works of mort&h (5th revision). supplying and laying polythene sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. providing and laying design mix concrete for plain / reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size
Sector: District Administration