Details: dismantling r.c. floor, roof, beams etc. including cutting rods and removing as directed within a lead of 75 m. including stacking of steel bars. - for 1st floor stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing within a lead of 75m as directed. removal of ,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the municipal / corporation rules for such disposal, loading into truck and cleaning the site in all respect as per direction of engineer in charge ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, as per relevant is codes. - pakur variety - for 1st floor hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete sla
Sector: University