Details: work schedule of construction of ladies toilet adjacent to the auditorium at 7th floor of amber building, wbmdfc. dismantling artificial stone flooring upto 50 mm. thick by carefully chiselling without damaging the base and removing as directed within a lead of 75 m taking out mirzapur or glazed porcelain tiles carefully by chiselling from walls or floor including stacking serviceable material as directed removal of ,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the municipal / corporation rules for such disposal, loading into truck and cleaning the site in all respect as per direction of engineer in charge stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing within a lead of 75m as directed. 1st class brickwork of width 200 mm. with non-modular bricks in cement and sand mortar (1:4)(b) in superstructure ground floor for toilet walls at 7th floor 125 mm. t
Sector: Social Development