Description: Arrangement of Temporary Electrical Installation work hiring of DG set with fuel and engagement of manpower for 23 days in respect to the Infrastructure facility to be provided at 19 nos accommodation centers under Chandannagar PS under the jurisdi Name of Work Arrangement of Temporary Electrical Installation work hiring of DG set with fuel and engagement of manpower for 23 days in respect to the Infrastructure facility to be provided at 19 nos accommodation centers under Chandannagar PS under the jurisdiction of the Chandannagar Police Commissionerate for advance CAPF Coys to be deployed in ensuing Parliamentary General Election 2024
Details: SUB-HEAD 1--CONTROL PANEL AND SWITCHES Providing on hire basis following devices etc. on wooden plank board or suitable angle iron frame incl. Providing inter-connection wiring with socketing, earthing attachment etc. and dismentaling at the of end function (with PWD / E.I.C. approved materials) 240V, 32 amp, DP Switch Rewireable type(For 1 to 3 days)(Temporary Schedule of PGE-2024 sl no.1)b) page no.04) 415V, 63 amp TPN switch with rewirable fuse(For 1 to 3 days) (Temporary Schedule of PGE-2024 sl no.1)d) page no.04) Providing on hire basis following switches etc. on wooden plank board or suitable angle iron frame incl. Providing inter-connection wiring with socketing, earthing attachment etc. and dismentaling at the of end function (with PWD / E.I.C. approved materials) 240V, 2+12 Way SPNBDB With 6 - 32 amp SPMCB as Outgoing & 40/63 amp DPMCB as Incoming.( For 1 to 3 days)(Temporary Schedule of PGE-2024 sl no.2)a) page no.04) 415V, upto 6 way TPNDB with 1 no.-63 amp FPMCB as
Sector: PWD