Details: earthwork in excavation from borrow pits (landowned/arranged by the department) and depositingin layers of 250 mm. including breaking clods inembankment works and to fill up back of abutments,depressions and ruts with an initial lead up to 50 m andinitial lift up to 1.5 m making bunds at top as directeddressing complete. (borrow pit measurement) earth work in excavation of foundation of structuresas per drawing and technical specification,including setting out, removing, spreading orstacking of spoils within a lead of 150 m. as directedand including trimming the sides of the trenches,leveling, dressing and ramming the bottom, andbackfilling with approved material complete as perdirection of the engineer-in-charge .i. in all sorts of soil excluding marshy soil & rocks(soft or hard) by manual means.a) upto 3 m depth sand filling in foundation trenches and at the backof abutments, wing-walls etc. with good local sandfree from earth in layers not exceeding 15 cm.including inundating each l
Sector: Zilla Parishad