Details: installation hot & cold water machine labour for boring tube well of required dia. by water jet system through any type of soil strata including hire and labour charges for boring pipes, scaffolding, tools and plants as necessary and taking out them and lowering pipes, strainers, blind pipe etc. and fitting and fixing the same complete including bucket washing and other incidental works in the connection. the tube well should have a minimum 50 mm gap in between the outside of the tubewell pipe and the bore. (d) for depth upto 150 metre for 50 mm dia. tube well with top of 100 mm dia. (i) 100 mm dia. boring etc. top (ii) 50 mm dia. boring etc. (f) for depth more than 150 metre for 50 mm dia. tube well with top of 100 mm dia.(i) 50 mm dia. boring etc. beyond 150 metre supplying , fitting and fixing steel cutter piece up to 450 mm long with sockets(ii) 50 mm dia supplying high density polythene strainer of approved make with adapter conforming to i.s. specifications.(i) 50 mm dia
Sector: Zilla Parishad