Description: Supply and installation of Auto Manual Traffic Signal System at the mergining point on Vidyasagar Setu near Jubilee lane for Howrah Nabanna bound Name of Work Supply and installation of Auto Manual Traffic Signal System at the mergining point on Vidyasagar Setu near Jubilee lane for Howrah Nabanna bound
Details: Supply and installation of microcomputer microprocessor based Auto/Manual Traffic Sequence Controller including providing of cabinet ,Junction Box and other accessories necessary to equip the Controller fully.All Controller shall be full euipped to meet method of control specified for given intersection and shall be capable of expansion, upgradation including,synchronisation with set of signals on site at further date.Controller shall be equiped for taking seven phases,including Pedestrain phases. Controllers shall be capable of operating in the modes. a) Fixed time. b) Demand dependent as per plan c) Manual. d) Flashing. There should be a provision of 8 set of plan a day and to be operated by 230 V AC Supply and installation of Polycarbonate signal aspects of size 300mm.dia.including Light Emitting,Diode (LED) display units, visor lenses of appropriate colour brackets, frame works,clamping bars,flexible wies,flexible pipes etc.for side mounting,wiring etc.f
Sector: Infrastructure