Description: Construction of Protection Wall at Behind of Power House under Rammam Hydel Project St II Darjeeling Name of Work Emergency Construction of Protection Wall behind Power House under Rammam Hydel Project St II
Details: Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150m as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . V. In Hard rock ( blasting prohibited ) (iii) Without pumping out water Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing as directed within a lead of 75 m. Labour for laying 150 mm to 200 mm boulder soling including rough dressing, hand packing and ramming down small pieces in the interstics e
Sector: Distribution