Details: boundary wall (civil work)earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75m as directed. the item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required.(a) depth of excavation not exceeding 1500mmbrick work with 1st class bricks in cement mortar(1:6)(b) in superstructure, ground floor(i) cement concrete with graded stone ballast (40 mm size excluding shuttering) in ground floor "(a) pakur variety(a) (1:3:6) proportion"hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting,
Sector: Infrastructure