Description: Deployment of Surveyor for Prayagraj Bridge Project Name of Work LAYING ALIGNMENT OF BRIDGE CENTRE LINE VIS VIS CHECKING OF THE SAME BY SURVEYOR TEAM WITH TOTAL STATION INSTRUMENT OF 1MM ONE LEAST COUNT AND 1 ONE SECOND ACCURACY AND FIXING OF LEVEL CHECKING THE PEDESTAL POINTS ON EACH PIER FOR GANGA BRIDGE PROJECT PRAYAHRAJ
Details: Mobilization & Demobilization of Survey Team along with Total station and other allied accessories etc to Prayagraj Bridge Project site. Deployment of one (1) Survey Team consisting of two (2) Surveyors (at least 1 (one) surveyor having experience of minimum 03 (three) years for Degree holder or 05 (five) yeas for Diploma holder in this field), two (2) Assistant Surveyors and Two (2) Survey Helpers along with one (1) Electronic Total Station instrument with 1 (one) second accuracy and 1mm (one) least count for alignment of bridge (Centre line) and fixing of level (capable of measuring a distance of approx. 500mtrs. (five hundred) in reflector less mode and approximately 6km (six) with single prism under good weather condition) Prism Pole, Prism Stand, Digital Level Instrument and allied accessories in four Phases as per the scope of work enclosed and as per direction of Site In-Charge, Ganga Bridge Project, Prayagraj and/or their representative.Deployment of survey Team is required in
Sector: Infrastructure